Contact Us: (+356) 21 378 180
-
Air emissions monitoring at manufacturing plant
The facility, in Marsa Industrial Estate, operates under an Environmental Permit from MEPA. Since the plant uses solvents, the Env .... -
Compliance auditing of packaging waste recovery scheme
En-Sure was engaged by an accounting and auditing firm to provide environmental auditing services as part of a compliance audit of .... -
Construction at Portomaso
Operational monitoring during the construction of apartments, parking, natural sea water swimming pool and a roof garden, at Porto .... -
Packaging waste audit at private industrial facility
The purpose of the audit was to review the installation’s packaging waste practices, including generation, means of collection a .... -
Malta Freeport Extension
Two quays at the existing Malta Freeport in Birzebbuga are being extended. These are the west quay at Terminal One and the north q .... -
Installation of a temporary wind monitoring mast, at Ahrax Point, limits of Mellieha
Installation of a temporary wind monitoring mast at Ahrax Point, limits of Mellieha and decommissioning after a lapse of two years .... -
Refurbishment works at Marsaxlokk Breakwater
The aim of the monitoring exercise is to ensure that the surrounding water, and in particular, the seabed, are not adversely affec .... -
Extension of the Seabank Hotel, Mellieha
This project was the subject of an Appropriate Assessment (AA), which was required to determine the impact of the development on t .... -
Dredging and related works at Malta Freeport Terminals, Birzebugia
The project involves the upgrading of the vessel manoeuvring area, including dredging of the fairway, and the construction of a sl ....
Copyright © 2024 En-Sure Ltd. All Rights Reserved.