Contact Us: (+356) 21 378 180
In nature there are neither rewards nor punishments; there are consequences – Robert Green Ingersoll
Food manufacturing plant
Food manufacturing plant
Food manufacturing plant
 

Project Title: Initial environmental appraisal for food manufacturing plant

Start / Finish Dates:  October 2015 – ongoing

 

En-Sure was engaged by a food processing plant to carry out a preliminary assessment of its operations, in preparation for the company’s application with MEPA and the Water Services Corporation for an environmental permit and a sewer discharge permit.

 

The appraisal included a meeting with company representatives, a detailed site visit and a review of the company’s records.  The evaluation covered the following environmental aspects:

  • Site and environmental management;
  • Waste management;
  • Air emissions from boilers, generators and cooling towers;
  • Surface water and wastewater management;
  • Use of raw materials, chemicals and fuels;
  • Storage;
  • Noise;
  • Use of refrigerants; and
  • Emergency response.

 

The company was presented with a report that identified the areas where the plant is run in accordance with legislation or best practice, and also included recommendations for improvement of operations where necessary.