Contact Us: (+356) 21 378 180
Start / Finish Dates: November 2007 and November 2009
Waste Acceptance criteria (WAC) testing to determine the nature of the material resulting from the demolition of a series of factory buildings in Ricasoli. The project was carried out for Smart City, and then again for Bonnici Bros. Ltd. after one of the buildings burned down.
Copyright © 2024 En-Sure Ltd. All Rights Reserved.