Contact Us: (+356) 21 378 180
Start / Finish Dates: January - August 2013
This project involved dredging of the seabed in preparation for the new terminal extension at the Cirkewwa Ferry Terminal in Mellieha, maximising the use of the existing infrastructure through additional berthing facilities.
En-Sure’s role was to provide environmental site management services during construction, and to oversee marine ecological monitoring.
Copyright © 2024 En-Sure Ltd. All Rights Reserved.