Contact Us: (+356) 21 378 180
Start / Finish Dates: May 2012 – ongoing
Excavation and construction of a service gallery and associated ventilation and access shafts plus any other civil works. The tunnel will run from approximately ¾ of the route of a proposed tunnel from Swieqi to the proposed St Andrews Distribution Centre in Pembroke and leading to the Maghtab Terminal Station.
Copyright © 2024 En-Sure Ltd. All Rights Reserved.