Contact Us: (+356) 21 378 180
-
Chadwick Lakes (Wied il-Qlejgħa)
En-Sure was commissioned to provide environmental site management, monitoring, and drafting of environmental permit application se .... -
External Lighting Work Plan for a Leisure and Tourism Facility
En-Sure was engaged to prepare an External Lighting Work Plan that aimed to identify mitigating measures to reduce external lighti .... -
Land contamination study for a proposed WEEE recycling plant in Hal Far
Following the preparation of an Integrated Pollution Prevention and Control (IPPC) permit application for the proposed facility, w .... -
Waste management plan & environmental registration application for old people’s home in Gozo
In this project En-Sure assisted the client by preparing a waste management plan and an environmental registration application for .... -
Malta Carnival Experience
The Planning Authority (PA) recently approved the construction of the Malta Carnival Experience. This project, spearheaded by the .... -
Environmental permit application for manufacturing plant
En-Sure was engaged to prepare an Environmental Permit application for a company proposing to set up a facility for the manufactur .... -
Initial environmental appraisal for food manufacturing plant
En-Sure was engaged by a food processing plant to carry out a preliminary assessment of its operations, in preparation for the com .... -
Environmental Registration application for stables
The Environmental Registration application covered the conversion of a chicken farm to stables. The facility, located in Zejtun, .... -
Land and groundwater risk assessment for pharmaceutical plant
En-Sure was commissioned to carry out a land and groundwater risk assessment for a pharmaceutical facility in Ħal Far. The risk ....

Copyright © 2023 En-Sure Ltd. All Rights Reserved.